inert construction waste 惰性建築廢物

inert construction waste
繁: 惰性建築廢物
簡: 惰性建筑废物

文件提到,估計首批4個項目合共會產生約16.8萬公噸建築廢物,當中8.2%惰性建築廢物會在工地再用,另約74.5%惰性建築廢物會運送到公眾填料接收設施供日後再用;餘下的2.9萬公噸(17.3%)非惰性建築廢物則會於堆填區處置,相關運送及處置費用約1,470萬元。

啟德「簡約公屋」最快2026年完工(2023年2月1日)。文匯報,取自https://www.wenweipo.com/a/202302/01/AP63d9adb9e4b0ce76caa759ce.html

The administration clarified in October 2021 that the plan for the artificial islands for the Lantau Tomorrow Vision is to use inert construction waste from construction activities for about 50% of the reclamation materials and the rest mainly from manufactured sand instead of marine sand. 

Future of Hong Kong’s construction industry: key implications for contractors (2023, Feb 8). Pinsent Masons. Retrieved from https://www.pinsentmasons.com/out-law/analysis/future-of-hong-kongs-construction-industry-key-implications-for-contractors