three-runway system (3RS) 三跑道系統
three-runway system (3RS)
繁:三跑道系統
简:三跑道系统
香港機場管理局(機管局)8月1日宣佈,正式啟動香港國際機場第三跑道系統建造工程。
香港機場第三跑道工程正式啟動(2015年3月23日)。文匯報,取自 http://news.wenweipo.com/2016/08/02/IN1608020021.htm
Aviation experts have cast doubts on whether a three-runway system can handle 102 flights an hour, up from the current 68, as it depends on Shenzhen’s willingness to cede some of its airspace to Hong Kong.
Public opinion turns against third runway, poll shows. (2015, March 23). South China Morning Post. Retrieved from http://www.scmp.com/news/hong-kong/article/1744898/public-opinion-turns-against-third-runway-poll-shows