{"id":76434,"date":"2021-02-10T21:29:36","date_gmt":"2021-02-10T13:29:36","guid":{"rendered":"https:\/\/www.interpreting.hku.hk\/glossary\/?p=76434"},"modified":"2021-02-10T21:29:36","modified_gmt":"2021-02-10T13:29:36","slug":"nine-car-train-%e4%b9%9d%e5%8d%a1%e5%88%97%e8%bb%8a","status":"publish","type":"post","link":"https:\/\/www.interpreting.hku.hk\/glossary\/?p=76434","title":{"rendered":"nine-car train \u4e5d\u5361\u5217\u8eca"},"content":{"rendered":"<p>nine-car train<br \/>\n\u7e41\uff1a\u4e5d\u5361\u5217\u8eca<br \/>\n\u7b80\uff1a\u4e5d\u5361\u5217\u8f66<\/p>\n<blockquote><p>\u6e2f\u9435\u6771\u9435\u7dab\u65b0\u4fe1\u865f\u7cfb\u7d71\u53ca<strong>9\u5361\u5217\u8eca<\/strong>\u6295\u5165\u670d\u52d9\uff0c\u5728\u9996\u500b\u4e0a\u73ed\u65e5\u65e9\u4e0a\u7e41\u5fd9\u6642\u9593\uff0c\u6709\u4e58\u5ba2\u672a\u80fd\u4e0a\u8eca\uff0c\u6279\u8a55\u5b89\u6392\u6df7\u4e82\u3002<\/p><\/blockquote>\n<p>\u6771\u9435\u7dab\u4f7f\u7528\u4e5d\u5361\u5217\u8eca\u9996\u500b\u4e0a\u73ed\u65e5\u3000\u6709\u4e58\u5ba2\u6279\u5b89\u6392\u6df7\u4e82\uff082021\u5e742\u67087\u65e5\uff09\u3002<strong>Now\u65b0\u805e<\/strong>\uff0c\u53d6\u81ea <a href=\"https:\/\/news.now.com\/home\/local\/player?newsId=423341\" target=\"_blank\">https:\/\/news.now.com\/home\/local\/player?newsId=423341<\/a><\/p>\n<blockquote><p>The MTRC plans to commence the East Rail Line new signalling system and the new <strong>nine-car trains<\/strong> on February 6, and progressively replace the existing 12-car trains.<\/p><\/blockquote>\n<p>Rail signal system report reviewed. (2021, February 1). <em>news.gov.hk<\/em>. Retrieved from <a href=\"https:\/\/www.news.gov.hk\/eng\/2021\/02\/20210201\/20210201_160507_512.html?type=category&amp;name=infrastructure\" target=\"_blank\">https:\/\/www.news.gov.hk\/eng\/2021\/02\/20210201\/20210201_160507_512.html?type=category&amp;name=infrastructure<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>nine-car train<br \/>\n\u7e41\uff1a\u4e5d\u5361\u5217\u8eca<br \/>\n\u7b80\uff1a\u4e5d\u5361\u5217\u8f66<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[68,78],"tags":[],"class_list":["post-76434","post","type-post","status-publish","format-standard","hentry","category-all-terms-","category-technology-industry-transport-and-construction-"],"_links":{"self":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/76434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=76434"}],"version-history":[{"count":1,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/76434\/revisions"}],"predecessor-version":[{"id":76435,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/76434\/revisions\/76435"}],"wp:attachment":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=76434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=76434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=76434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}