{"id":54735,"date":"2015-06-15T14:27:56","date_gmt":"2015-06-15T06:27:56","guid":{"rendered":"http:\/\/www.interpreting.hku.hk\/glossary\/?p=54735"},"modified":"2017-05-12T11:09:12","modified_gmt":"2017-05-12T03:09:12","slug":"airport-construction-fee-%e6%a9%9f%e5%a0%b4%e5%bb%ba%e8%a8%ad%e8%b2%bb","status":"publish","type":"post","link":"https:\/\/www.interpreting.hku.hk\/glossary\/?p=54735","title":{"rendered":"airport construction fee \u6a5f\u5834\u5efa\u8a2d\u8cbb"},"content":{"rendered":"<p>airport construction fee<br \/>\n\u7e41\uff1a\u6a5f\u5834\u5efa\u8a2d\u8cbb<br \/>\n\u7b80\uff1a\u673a\u573a\u5efa\u8bbe\u8d39<\/p>\n<blockquote><p>\u9999\u6e2f\u6a5f\u5834\u7ba1\u7406\u5c40\u516c\u5e03\uff0c\u65bc8\u67081\u65e5\u6216\u4e4b\u5f8c\u767c\u51fa\u7684\u6a5f\u7968\uff0c\u5c07\u5fb5\u6536<strong>\u6a5f\u5834\u5efa\u8a2d\u8cbb<\/strong>\u3002<\/p><\/blockquote>\n<p>\u6a5f\u7ba1\u5c408\u6708\u8d77\u5411\u96e2\u6e2f\u65c5\u5ba2\u5fb5\u6a5f\u5834\u5efa\u8a2d\u8cbb\uff082016\u5e745\u670830\u65e5\uff09\u3002<strong>\u4fe1\u5831<\/strong>\uff0c\u53d6\u81ea\u00a0<a href=\"http:\/\/www2.hkej.com\/instantnews\/hongkong\/article\/1315227\" target=\"_blank\">http:\/\/www2.hkej.com\/instantnews\/hongkong\/article\/1315227<\/a><\/p>\n<blockquote><p>Airlines objected to the proposed <strong>airport construction fee<\/strong> of HK$180 being added to the existing HK$120 departure tax for each passenger, arguing that every 10 per cent increase in user charges would result in the loss of up to 80,000 passengers a year and some 600 jobs.<\/p><\/blockquote>\n<p>Jiang, S. (2015, May 18).\u00a0Airport Authority to offer third runway plan with lower user charge in a month. <em>South China Morning Post<\/em>. Retrieved from\u00a0<a href=\"http:\/\/www.scmp.com\/business\/companies\/article\/1802476\/airport-authority-offer-third-runway-plan-lower-user-charge-month\" target=\"_blank\">http:\/\/www.scmp.com\/business\/companies\/article\/1802476\/airport-authority-offer-third-runway-plan-lower-user-charge-month<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>airport construction fee <br \/>\u7e41\uff1a\u6a5f\u5834\u5efa\u8a2d\u8cbb <br \/>\u7b80\uff1a\u673a\u573a\u5efa\u8bbe\u8d39<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[68,78],"tags":[93],"class_list":["post-54735","post","type-post","status-publish","format-standard","hentry","category-all-terms-","category-technology-industry-transport-and-construction-","tag-airport-three-runway-system-"],"_links":{"self":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/54735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=54735"}],"version-history":[{"count":3,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/54735\/revisions"}],"predecessor-version":[{"id":62721,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=\/wp\/v2\/posts\/54735\/revisions\/62721"}],"wp:attachment":[{"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=54735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=54735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.interpreting.hku.hk\/glossary\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=54735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}